Pressure Vessels

Compressed air storage tanks are pressure vessels that must comply with strict codes for design, manufacturing, and inspection.

ASME Standards

Section VIII - Pressure Vessels

┌─────────────────────────────────────────────────────────┐
│ ASME BPVC SECTION VIII │
├─────────────────────────────────────────────────────────┤
│ │
│ Division 1: General rules │
│ • Pressures up to 3,000 psi │
│ • Safety factor 3.5 │
│ • Most common in industry │
│ │
│ Division 2: Alternative rules │
│ • Detailed stress analysis │
│ • Safety factor 2.4 │
│ • Specialized applications │
│ │
│ Division 3: High pressure │
│ • Pressures greater than 10,000 psi │
│ • Special requirements │
│ │
└─────────────────────────────────────────────────────────┘

U Stamp

Typical nameplate (U Stamp):

┌─────────────────────────────────────────┐
│ [U] │
│ │
│ MFG: ABC Vessel Co. │
│ S/N: 12345 │
│ YEAR: 2024 │
│ │
│ MAWP: 200 PSIG @ 650°F │
│ MDMT: -20°F @ 200 PSIG │
│ │
│ SA-516-70 / NB-12345 │
└─────────────────────────────────────────┘

MAWP = Maximum Allowable Working Pressure
MDMT = Minimum Design Metal Temperature
NB = National Board Registration Number

Manufacturing Requirements

ElementRequirement
MaterialsASME specification
WeldingQualified procedures
WeldersCertified
Heat treatmentPer code
InspectionBy Authorized Inspector
TestingHydrostatic 1.3× MAWP

Vessel Components

Tank Anatomy

                    Relief connection

┌─────┴─────┐
Air ════════►│ │
inlet │ │
│ │◄─── Level sight glass
│ TANK │
Air ◄════════│ │
outlet │ │
│ │◄─── Pressure gauge
│ │
└─────┬─────┘

Drain
(manual or auto)

Supports

Required Accessories

AccessoryFunctionCode
Relief valveOverpressure protectionASME Section VIII
Pressure gaugePressure indicationRecommended
DrainCondensate removalRecommended
ManwayInspection access>18" diameter
NameplateIdentificationRequired

Relief Valves

Types

Conventional relief valve:

Outlet

┌──────┴──────┐
│ Spring │
│ ◯◯◯ │
│ ◯◯◯ │
│ ┌─────┐ │
│ │Disc │ │
│ └──┬──┘ │
│ │ │
└──────┼──────┘

Inlet
(pressure)
TypeApplicationCharacteristics
ConventionalStandardAtmospheric discharge
BalancedVariable backpressureInternal bellows
Pilot operatedHigh capacityPilot-operated

Sizing

Required capacity:

W = Air inlet to system (SCFM)

The valve must be able to discharge all capacity
from compressors feeding the tank.

Example:
2 compressors at 500 CFM each
Required PSV capacity = 1,000 SCFM minimum

Pressure Settings

ParameterTypical Value
Set pressureVessel MAWP
Overpressure3% (fire) or 10% (process)
Reseat pressure93-96% of set
Maximum accumulation10% above MAWP

Vessel Inspection

Inspection Types

┌─────────────────────────────────────────────────────────┐
│ INSPECTION PROGRAM │
│ │
│ INTERNAL (requires entry): │
│ ├─ Visual surface inspection │
│ ├─ Thickness measurement │
│ ├─ Corrosion detection │
│ └─ Weld inspection │
│ │
│ EXTERNAL (in-service): │
│ ├─ Paint condition │
│ ├─ Supports and anchors │
│ ├─ Visible leaks │
│ └─ Insulation condition │
│ │
│ ACCESSORIES: │
│ ├─ Relief valves (annual) │
│ ├─ Gauges (calibration) │
│ └─ Drains (operation) │
│ │
└─────────────────────────────────────────────────────────┘

Inspection Frequency

TypeFrequencyResponsible
External visualMonthlyOperator
Internal visual5 yearsCertified inspector
Thickness measurement5-10 yearsCertified inspector
Hydrostatic testIf concerns existPer code
PSVAnnualCertified shop

Rejection Criteria

ConditionAction
Thickness < minimumRepair or replace
Active corrosionClean, evaluate, repair
Deep pittingEvaluate with engineer
CracksStop use, evaluate
DeformationStop use, evaluate

Repairs and Alterations

Repair Code

ASME/NB repair process:

1. Detect problem


2. Evaluate extent


3. Develop procedure ◄── Qualified engineer


4. Approve by inspector ◄── Authorized Inspector


5. Execute repair ◄────── Certified welders


6. Inspect result


7. Document (R-Form) ◄── National Board

Permitted Repairs

TypeRequirements
WeldingQualified procedure, certified welder
PatchEngineering calculations
Nozzle replacementPer original design
Adding connectionsCalculations, AI approval

Prohibited Repairs

  • Hammering to stop leaks
  • Welding without qualification
  • Material changes without approval
  • Exceeding original MAWP
  • Permanent "temporary" patches

Retirement from Service

Criteria

ConditionAction
Excessive ageEvaluate, possible retirement
Insufficient thicknessDerate pressure or retire
Repair historyEvaluate viability
Missing documentationSpecial inspection
ObsolescenceReplace

Retirement Process

1. Fully depressurize
2. Purge with clean air
3. Disconnect from system
4. Remove relief valve
5. Mark "OUT OF SERVICE"
6. Render unusable (drill or cut)
7. Document retirement
8. Dispose per regulations

Documentation

Required File

DocumentContents
Manufacturer's reportU-1, calculations, MTR
National Board certificateNB registration
Inspection historyAll inspections
Repair reportsR-Forms if applicable
PSV certificatesAnnual tests
Legal Responsibility

The owner/operator is legally responsible for vessel integrity. Inspections must be performed by qualified personnel and properly documented.